- If you are submitting any of the following design applications, please include one set of drawings (folded) and one set of calculations:
- Boiler/Pressure Vessel Design Registration.
- Registration of Pressure Piping Design.
- Fitting Design Registration (1 copy of the completed TSK-1008 Statutory Declaration (Registration of Fittings) form is also required).
- If you resubmit a design prior to TSASK review, it is not considered a new application. Please make reference to the original submission by tracking number.
- If you resubmit a design after TSASK review is complete and registration has been issued, this will be considered a new submission upon re-application. In this instance, design review and any additional fees as per fee schedule will apply to the re-submission.
- If our office attempts to contact you with a deficiency list or comments, and you fail to reply within 60 calendar days, this will result in automatic rejection of the design.
- A re-submission made after registration has been rejected is considered a new submission upon re-application. In this instance, design review and any additional fees as per fee schedule will apply to the re-submission.
- When a design is rejected, an invoice for the review and additional fees, as applicable, will be sent to the applicant.
- When a submission is withdrawn (cancelled) after completion of review, an invoice for review time and additional fees, as applicable, will be sent to the applicant.